怎么檢查燃氣發電機組的進氣系統?

返回 2025.11.15 來源:http://m.hdlelisa.com 0

  燃氣發電機組安全操作規程

  Safety Operation Regulations for Gas Generator Setsbase64_image

  一、發電機組啟動前的準備

  1、 Preparation before starting the generator set

  1、外觀狀況檢查發電機組所有零部件齊全完整,各管路連接正確、密封有效,底盤及各部件聯結牢固,無松動現象。

  1. Inspect the appearance of the generator set to ensure that all components are complete and intact, all pipelines are connected correctly and sealed effectively, and the chassis and components are firmly connected without any looseness.

  2、進氣系統檢查發電機組進氣口前的燃氣管道、燃氣處理設備、安全裝置聯接可靠,無泄漏;打開燃氣閥門,檢查機組燃氣管路應無漏氣。

  2. Check the gas pipeline, gas treatment equipment, and safety devices in front of the intake system of the generator set for reliable connection and no leakage; Open the gas valve and check that there is no air leakage in the gas pipeline of the unit.

  3、潤滑系統檢查向油底殼內加注合格、清潔的機油,機油液面高度應接近油標尺的上刻度線位置。

  3. Check the lubrication system and add qualified and clean engine oil to the oil pan. The oil level should be close to the upper mark of the dipstick.

  4、冷卻系統檢查(1)檢查機組內循環冷卻水是否清潔,并符合規定要求:向高架水箱內加注清潔的軟化水,水面高度到合適位置。

  4. Cooling system inspection (1) Check whether the circulating cooling water inside the unit is clean and meets the specified requirements: add clean softened water to the elevated water tank, and raise the water level to the appropriate position.

  (2)檢查機組外循環冷卻水池水位、水質。

  (2) Check the water level and quality of the external circulating cooling water tank of the unit.

  (3)環境溫度低于5C時,應將內循環冷卻水和潤滑油預熱到20C以上。

  (3) When the ambient temperature is below 5C, the internal circulating cooling water and lubricating oil should be preheated to above 20C.

  5、電氣系統檢查(1)檢查各處連接導線是否牢固,電氣回路的對地以及回路之間的絕緣電阻是否達到規定值。(測量過程中,機組的電氣部分、半導體元件、電容器等元件的連接應全部斷開(測量結果應不低于2MQ)。蓄電池的接線應牢固可靠,接線應首先將蓄電池的正極接入啟動繼電器下接線柱上;然后再將負極接入機器底盤上并將接線處的漆銹清除干凈。

  5. Electrical system inspection (1) Check whether the connecting wires at all locations are firm, whether the ground resistance of the electrical circuit and the insulation resistance between circuits meet the specified values. During the measurement process, all connections of the electrical parts, semiconductor components, capacitors, and other components of the unit should be disconnected (the measurement result should not be less than 2MQ). The wiring of the battery should be firm and reliable. The positive terminal of the battery should be connected to the lower terminal of the starting relay first; Then connect the negative electrode to the machine chassis and clean the paint rust at the wiring.

  (2)機組并網(并車)運行前進行相序檢查,確保發電機組的相序與電網的相序相同,或機組與機組間相序一致。初次投入運行的機組應測量各個電氣回路的絕緣電阻:測量發電機繞組絕緣電阻時應先將“AVR”板上X1插頭拆下,其絕緣電阻應>2M2,已運行的機組絕緣電阻應>0.5MQ。檢查控制屏上的報警指示及聲響動作正常。合上蓄電池開關,按動試報警按鈕,各指示燈應同時閃爍,電鈴或電喇叭發出報警聲響,按動消音按鈕,聲響終止:按動報警解除按鈕,各指示燈熄滅。

  (2) Before the unit is connected to the grid (parallel operation), a phase sequence check should be conducted to ensure that the phase sequence of the generator set is the same as that of the power grid, or that the phase sequence between units is consistent. The insulation resistance of each electrical circuit should be measured for the first operation of the unit: when measuring the insulation resistance of the generator winding, the X1 plug on the "AVR" board should be removed first, and its insulation resistance should be>2M2. The insulation resistance of the already operated unit should be>0.5MQ. Check that the alarm indication and sound action on the control screen are normal. Close the battery switch, press the alarm button, and all indicator lights should flash simultaneously. The electric bell or horn should sound an alarm. Press the mute button to stop the sound. Press the alarm release button to turn off all indicator lights.

  (3)?運行前,先合上控制屏上端的隔離開關(編號QS),然后將控制屏各開關置于下表所示狀態:

  (3) Before operation, first close the isolation switch (numbered QS) at the top of the control screen, and then place each switch on the control screen in the state shown in the table below:

  (4)?燃氣機組TEM電子管理系統控制柜內電源總開關置于接通位置,船形開關置于ON位置,打開主機窗口合上電源開關并按下顯示器按鈕,進入Windows2000系統后,雙擊12V--190機組圖標,即可進入控制程序。

  (4) The main power switch in the TEM electronic management system control cabinet of the gas turbine unit is placed in the on position, and the ship shaped switch is placed in the ON position. Open the host window, close the power switch, and press the display button. After entering the Windows 2000 system, double-click the 12V-190 unit icon to enter the control program.

  (5)?開機前必須將起動蓄電池的充電機電源關斷:或將充電機負極接線夾頭拆下并夾在負極線的絕緣。

  (5) Before starting up, the power supply of the charging machine for the starting battery must be turned off, or the negative terminal clamp of the charging machine must be removed and clamped onto the insulation of the negative terminal wire.

  (6)?將控制屏及微機柜緊急停機按鈕釋放,按下微機柜上的起動按鈕。

  (6) Release the emergency stop button on the control screen and micro cabinet, and press the start button on the micro cabinet.

  (7)?用手動機油泵泵油, (或用電動預供油泵泵油,蓄電池電量允許時),當油壓力表指示為0.1Mpa時停停止供油。

  (7) Use a manual oil pump to pump oil (or use an electric pre supply oil pump to pump oil, when the battery power allows), and stop supplying oil when the oil pressure gauge indicates 0.1Mpa.

  (8)?盤車:用人力盤轉曲軸,至少兩周,不得有卡滯或異常現象。

  (8) Turning: Manually turn the crankshaft for at least two weeks without any jamming or abnormal phenomena.

  二、發電機組的啟動及運行

  2、 Startup and operation of generator set

  1、機組的啟動(1)?關閉機組氣源蝶閥,踏下啟動總開關,按下啟動按鈕(3~5秒),對機組排空。

  1. To start the unit (1), close the unit's air source butterfly valve, step on the main start switch, press the start button (3-5 seconds), and empty the unit.

  (2)?打開氣源蝶閥,燃氣壓力最低不小于0.05 MPa,最高不大于0.3MPa。

  (2) Open the gas source butterfly valve, and ensure that the minimum gas pressure is not less than 0.05 MPa and the maximum is not greater than 0.3 MPa.

  (3)?踩下腳踏開關,按下啟動按鈕,發動機啟動點火運轉。起動電機連續運行不得超過10秒,若三次啟動不成功,應及時查明原因后方可再次啟動。注意:發動機啟動后,要立即釋放啟動按鈕,并踢開腳踏開關,以免損壞啟動電機。

  (3) Step on the foot switch, press the start button, and the engine will start and ignite. The starting motor should not run continuously for more than 10 seconds. If it fails to start three times, the cause should be promptly identified before restarting. Attention: After starting the engine, immediately release the start button and kick off the foot switch to avoid damaging the starter motor.

  (4)?發動機啟動后,使其運轉在600r/min~800r/min總速運行,進行暖機,同時觀察各儀表指示是否正常。

  (4) After starting the engine, run it at a total speed of 600r/min~800r/min, warm up the engine, and observe whether the instrument readings are normal.

  (5)?觀察各缸缸溫、排溫是否正常。焦爐煤氣機組:當個別缸溫超過300C時,迅速減小相應缸步進電機控制器的步數,當缸溫低于150C;排溫低于300C時增加相應缸步進電機控制器的步數。

  (5) Observe whether the cylinder temperature and exhaust temperature of each cylinder are normal. Coke oven gas unit: When the temperature of individual cylinders exceeds 300C, quickly reduce the number of steps of the corresponding cylinder stepper motor controller. When the cylinder temperature is below 150C, increase the number of steps of the corresponding cylinder stepper motor controller.

  (6)?將怠速/額定轉換開關置于“額定”位置,使發電機組空載運行,待發動機油溫、水溫升至40C后,方可并網運行。

  (6) Place the idle/rated switch in the "rated" position to allow the generator set to run without load. Only when the engine oil and water temperatures rise to 40C, can it be connected to the grid for operation.

  (7)?調整電壓整定電位器使空載電壓為400V左右,調整轉速微調電位器使頻率為50HZ。

  (7) Adjust the voltage setting potentiometer to achieve a no-load voltage of around 400V, and adjust the speed fine-tuning potentiometer to achieve a frequency of 50HZ.

  (8)?按下控制屏上的儲能按鈕,給主開關儲能。

  (8) Press the energy storage button on the control screen to store energy for the main switch.

  2、機組并網運行

  2. Unit grid connected operation

  (1)、待發電機組運行正常后,先將發電機組的電壓、頻率調整至與電網大致相同時,再把同步測量開關置于“井車”位置,觀察同步表;

  (1) After the generator set is running normally, first adjust the voltage and frequency of the generator set to be roughly the same as the power grid, then place the synchronous measurement switch in the "well car" position and observe the synchronous meter;

  (2)、調整控制屏上的轉速微調電位器,使之與電網頻率相同,即同步表頻率差指示“Hz”指針處在中間略高位置:

  (2) Adjust the speed adjustment potentiometer on the control screen to be the same as the grid frequency, that is, the synchronous meter frequency difference indicator "Hz" pointer is slightly higher in the middle:

  (3) 、調節電壓整定電位器,使機組電壓與電網電壓相同,即同步表電壓差指示“V”指在中間位置。注意:反復調整發電機組,并觀察同步表相位差指示“S”指針,使其緩慢順時針旋轉。當指針旋轉接近垂直向上位置時,左手按下主開關合閘按鈕,右手斷開同步測量開關,主開關合閘并網發電。左手調整電壓整定電位器,將功率因數控制在滯后0.9-0.8之間,右手緩慢調整轉速微調電位器給機組加載。調整功率到合適位置(新機為60%Pe)最后將功率因數調整在0.8-0.9之間。

  (3) Adjust the voltage setting potentiometer to ensure that the unit voltage is the same as the grid voltage, i.e. the synchronous meter voltage difference indicator "V" is in the middle position. Attention: Adjust the generator set repeatedly and observe the phase difference indicator "S" pointer on the synchronous meter to make it slowly rotate clockwise. When the pointer rotates close to the vertical upward position, press the main switch closing button with your left hand, disconnect the synchronous measurement switch with your right hand, and close the main switch for grid connected power generation. Adjust the voltage setting potentiometer with your left hand to control the power factor between 0.9-0.8 hysteresis, and slowly adjust the speed adjustment potentiometer with your right hand to load the unit. Adjust the power to the appropriate position (60% Se for the new machine) and finally adjust the power factor between 0.8-0.9.

  (4)發電機并網運行中,應注意觀察電器儀表及微機柜主控畫面各項參數的指示狀況,并根據技術要求,及時修正各項參數。

  (4) During the grid connected operation of the generator, attention should be paid to observing the indication status of various parameters on the electrical instruments and micro cabinet main control screen, and timely correcting various parameters according to technical requirements.

  (5)機組正常運行中,每15分鐘作一次巡回檢查,觀察油溫、水溫、機油壓力、壓差、燃氣壓力及水位、油位,每兩小時對機組參數作一次記錄。三、發電機組的停機1、機組停機前,要先卸去負荷,緩慢逆時針調節轉速微調電位器,逐漸卸下負載。同時,緩慢旋轉電壓整定電位器,將功率因數控制在0.95-0.7之間,當功率降至50KW以下時,迅速按下分閘按鈕,然后使機組在額定轉速下運行幾分鐘。

  (5) During normal operation of the unit, a patrol inspection is conducted every 15 minutes to observe the oil temperature, water temperature, oil pressure, pressure difference, gas pressure, water level, and oil level. The unit parameters are recorded every two hours. 3、 Shutdown of Generator Set 1. Before shutting down the generator set, the load should be removed first, and the speed adjustment potentiometer should be slowly adjusted counterclockwise to gradually remove the load. At the same time, slowly rotate the voltage setting potentiometer to control the power factor between 0.95-0.7. When the power drops below 50KW, quickly press the disconnect button and let the unit run at rated speed for a few minutes.

  2、將轉速轉換開關撥至“怠速”位置,使機組轉速降至總速運行。

  2. Turn the speed conversion switch to the "idle" position to reduce the unit speed to the total speed for operation.

  3、待機組油溫、水溫降至40C以下時,關斷機組氣源蝶閥,將電磁閥開關、電調開關置于斷開位置,并按下微機柜緊急停機按鈕,機組停止。

  3. When the oil and water temperature of the standby unit drops below 40C, turn off the air source butterfly valve of the unit, place the solenoid valve switch and electric control switch in the off position, and press the emergency stop button of the micro cabinet to stop the unit.

  4、較長時間停機或機組檢修時,應關閉外循環冷卻水進口閥門和燃氣進口閥門。若環境溫度低于5C時,還應將機組內循環冷卻水放凈,并將水泵及外循環冷卻水管線上的放水堵打開將水放凈,必要時應用空氣壓縮機吹掃管線。

  4. When the unit is shut down for a long time or undergoing maintenance, the external circulation cooling water inlet valve and gas inlet valve should be closed. If the ambient temperature is below 5C, the circulating cooling water inside the unit should be drained completely, and the drain plugs on the water pump and external circulating cooling water pipeline should be opened to drain the water. If necessary, an air compressor should be used to blow the pipeline.

  5、手動盤車至少5圈,同時有手動預供油泵泵油0.01Mpa。

  5. Manual turning should be done at least 5 times, and there should be a manual pre supply oil pump that pumps oil at 0.01Mpa.

  四、發電機組故障停機的處理

  4、 Handling of generator set shutdown due to malfunction

  1、當發電機組因超速、過電流、逆功率、水溫、油溫高及油壓低故障,引起突然停機時。應關斷氣源,查明故障原因并妥善處理后方可開機。2、當遇有緊急情況,可按下“緊急停車”按鈕,使機組停機。注意:突然緊急停機后,一定要用人力盤車,盤轉曲軸至少5圈,同時用手動預供油泵泵油,待機組水溫、油溫降低后,進行檢查處理,并向有關部門或領導匯報。

  1. When the generator set suddenly shuts down due to overspeed, overcurrent, reverse power, high water temperature, high oil temperature, and low oil pressure faults. The gas source should be turned off, the cause of the malfunction should be identified and properly handled before starting up. 2. In case of emergency, the "emergency stop" button can be pressed to shut down the unit. Attention: After a sudden emergency stop, it is necessary to manually turn the crankshaft at least 5 times and use a manual pre supply oil pump to pump oil. After the water temperature and oil temperature of the standby group decrease, check and handle it, and report to the relevant department or leader.

  檢查燃氣發電機組的進氣系統,可按以下步驟進行:

  To check the intake system of the gas generator set, the following steps can be taken:

  1.外觀檢查

  1. Appearance inspection

  · 檢查進氣管道、濾清器、連接法蘭等部件是否有破損、裂縫或松動,確保所有連接部位密封良好,無漏氣現象。

  ·Check for any damage, cracks, or looseness in the intake pipes, filters, connecting flanges, and other components to ensure that all connecting parts are well sealed and free of air leaks.

  · 查看空氣濾清器是否堵塞或臟污,若濾清器阻力增大,可能導致進氣不暢,需及時清理或更換。

  ·Check if the air filter is clogged or dirty. If the filter resistance increases, it may cause poor air intake and needs to be cleaned or replaced in a timely manner.

  2.壓力檢查

  2. Pressure check

  · 檢查進氣系統的壓力傳感器,確保其正常工作,顯示的壓力值應在機組規定的范圍內。

  ·Check the pressure sensor of the intake system to ensure its normal operation, and the displayed pressure value should be within the range specified by the unit.

  · 若配備壓差傳感器,監測濾清器前后壓差,當壓差超過設定值時,可能表示濾清器堵塞或系統存在故障,需進一步排查。

  ·If equipped with a differential pressure sensor to monitor the pressure difference before and after the filter, when the pressure difference exceeds the set value, it may indicate that the filter is clogged or there is a system malfunction, and further investigation is needed.

  3.進氣閥門檢查

  3. Inspection of intake valve

  · 檢查進氣閥門的開閉狀態是否正常,閥門應能靈活開啟和關閉,無卡滯或泄漏。

  ·Check if the opening and closing status of the intake valve is normal. The valve should be able to open and close flexibly without any jamming or leakage.

  · 確認閥門的控制機構(如電動閥、氣動閥)工作正常,能準確響應機組的運行指令。

  ·Confirm that the control mechanism of the valve (such as electric valve, pneumatic valve) is working properly and can accurately respond to the operating instructions of the unit.

  4.進氣控制系統檢查

  4. Inspection of intake control system

  · 檢查進氣控制系統的電氣連接是否牢固,有無松動、腐蝕或損壞的跡象。

  ·Check if the electrical connections of the intake control system are secure and if there are any signs of looseness, corrosion, or damage.

  · 若機組配備進氣調節裝置(如節氣門、進氣旁通閥等),檢查其動作是否靈活,調節功能是否正常。

  ·If the unit is equipped with an intake control device (such as throttle valve, intake bypass valve, etc.), check whether its action is flexible and whether the adjustment function is normal.

  5.防喘振系統檢查

  5. Inspection of anti surge system

  · 對于配備防喘振裝置的機組,檢查防喘振閥的開閉狀態和動作是否正常,確保其能在機組運行過程中有效防止喘振現象的發生。

  ·For units equipped with anti surge devices, check whether the opening and closing status and action of the anti surge valve are normal, to ensure that it can effectively prevent the occurrence of surge phenomenon during the operation of the unit.

  · 檢查防喘振系統的控制邏輯和傳感器信號是否正常,確保系統能根據機組的運行工況自動調整防喘振閥的開度。

  ·Check whether the control logic and sensor signals of the anti surge system are normal, and ensure that the system can automatically adjust the opening of the anti surge valve according to the operating conditions of the unit.

  6.清潔與維護

  6. Cleaning and maintenance

  · 定期清理進氣系統的灰塵、雜物和積碳,保持進氣通道的暢通。

  ·Regularly clean the dust, debris, and carbon deposits in the intake system to keep the intake passage unobstructed.

  · 根據機組的運行環境和使用頻率,定期更換空氣濾清器,以保證進氣質量。通過以上檢查,可及時發現進氣系統的問題并進行處理,確保燃氣發電機組的正常運行。若發現問題,應及時聯系專業維修人員進行檢修。

  ·Regularly replace the air filter according to the operating environment and frequency of use of the unit to ensure intake quality. Through the above inspections, problems with the intake system can be promptly identified and addressed to ensure the normal operation of the gas generator set. If any problems are found, professional maintenance personnel should be contacted in a timely manner for repair.

  本文由 燃氣發電機組  友情奉獻.更多有關的知識請點擊  http://m.hdlelisa.com/   真誠的態度.為您提供為全面的服務.更多有關的知識我們將會陸續向大家奉獻.敬請期待.

  This article is a friendly contribution from a gas generator set For more related knowledge, please click http://m.hdlelisa.com/ Sincere attitude To provide you with comprehensive services We will gradually contribute more relevant knowledge to everyone Coming soon.

新聞搜索
濟南濟柴環能燃氣發電設備有限公司
  • 服務熱線


    0531-69951266

怎么檢查燃氣發電機組的進氣系統?

  燃氣發電機組安全操作規程

  Safety Operation Regulations for Gas Generator Setsbase64_image

  一、發電機組啟動前的準備

  1、 Preparation before starting the generator set

  1、外觀狀況檢查發電機組所有零部件齊全完整,各管路連接正確、密封有效,底盤及各部件聯結牢固,無松動現象。

  1. Inspect the appearance of the generator set to ensure that all components are complete and intact, all pipelines are connected correctly and sealed effectively, and the chassis and components are firmly connected without any looseness.

  2、進氣系統檢查發電機組進氣口前的燃氣管道、燃氣處理設備、安全裝置聯接可靠,無泄漏;打開燃氣閥門,檢查機組燃氣管路應無漏氣。

  2. Check the gas pipeline, gas treatment equipment, and safety devices in front of the intake system of the generator set for reliable connection and no leakage; Open the gas valve and check that there is no air leakage in the gas pipeline of the unit.

  3、潤滑系統檢查向油底殼內加注合格、清潔的機油,機油液面高度應接近油標尺的上刻度線位置。

  3. Check the lubrication system and add qualified and clean engine oil to the oil pan. The oil level should be close to the upper mark of the dipstick.

  4、冷卻系統檢查(1)檢查機組內循環冷卻水是否清潔,并符合規定要求:向高架水箱內加注清潔的軟化水,水面高度到合適位置。

  4. Cooling system inspection (1) Check whether the circulating cooling water inside the unit is clean and meets the specified requirements: add clean softened water to the elevated water tank, and raise the water level to the appropriate position.

  (2)檢查機組外循環冷卻水池水位、水質。

  (2) Check the water level and quality of the external circulating cooling water tank of the unit.

  (3)環境溫度低于5C時,應將內循環冷卻水和潤滑油預熱到20C以上。

  (3) When the ambient temperature is below 5C, the internal circulating cooling water and lubricating oil should be preheated to above 20C.

  5、電氣系統檢查(1)檢查各處連接導線是否牢固,電氣回路的對地以及回路之間的絕緣電阻是否達到規定值。(測量過程中,機組的電氣部分、半導體元件、電容器等元件的連接應全部斷開(測量結果應不低于2MQ)。蓄電池的接線應牢固可靠,接線應首先將蓄電池的正極接入啟動繼電器下接線柱上;然后再將負極接入機器底盤上并將接線處的漆銹清除干凈。

  5. Electrical system inspection (1) Check whether the connecting wires at all locations are firm, whether the ground resistance of the electrical circuit and the insulation resistance between circuits meet the specified values. During the measurement process, all connections of the electrical parts, semiconductor components, capacitors, and other components of the unit should be disconnected (the measurement result should not be less than 2MQ). The wiring of the battery should be firm and reliable. The positive terminal of the battery should be connected to the lower terminal of the starting relay first; Then connect the negative electrode to the machine chassis and clean the paint rust at the wiring.

  (2)機組并網(并車)運行前進行相序檢查,確保發電機組的相序與電網的相序相同,或機組與機組間相序一致。初次投入運行的機組應測量各個電氣回路的絕緣電阻:測量發電機繞組絕緣電阻時應先將“AVR”板上X1插頭拆下,其絕緣電阻應>2M2,已運行的機組絕緣電阻應>0.5MQ。檢查控制屏上的報警指示及聲響動作正常。合上蓄電池開關,按動試報警按鈕,各指示燈應同時閃爍,電鈴或電喇叭發出報警聲響,按動消音按鈕,聲響終止:按動報警解除按鈕,各指示燈熄滅。

  (2) Before the unit is connected to the grid (parallel operation), a phase sequence check should be conducted to ensure that the phase sequence of the generator set is the same as that of the power grid, or that the phase sequence between units is consistent. The insulation resistance of each electrical circuit should be measured for the first operation of the unit: when measuring the insulation resistance of the generator winding, the X1 plug on the "AVR" board should be removed first, and its insulation resistance should be>2M2. The insulation resistance of the already operated unit should be>0.5MQ. Check that the alarm indication and sound action on the control screen are normal. Close the battery switch, press the alarm button, and all indicator lights should flash simultaneously. The electric bell or horn should sound an alarm. Press the mute button to stop the sound. Press the alarm release button to turn off all indicator lights.

  (3)?運行前,先合上控制屏上端的隔離開關(編號QS),然后將控制屏各開關置于下表所示狀態:

  (3) Before operation, first close the isolation switch (numbered QS) at the top of the control screen, and then place each switch on the control screen in the state shown in the table below:

  (4)?燃氣機組TEM電子管理系統控制柜內電源總開關置于接通位置,船形開關置于ON位置,打開主機窗口合上電源開關并按下顯示器按鈕,進入Windows2000系統后,雙擊12V--190機組圖標,即可進入控制程序。

  (4) The main power switch in the TEM electronic management system control cabinet of the gas turbine unit is placed in the on position, and the ship shaped switch is placed in the ON position. Open the host window, close the power switch, and press the display button. After entering the Windows 2000 system, double-click the 12V-190 unit icon to enter the control program.

  (5)?開機前必須將起動蓄電池的充電機電源關斷:或將充電機負極接線夾頭拆下并夾在負極線的絕緣。

  (5) Before starting up, the power supply of the charging machine for the starting battery must be turned off, or the negative terminal clamp of the charging machine must be removed and clamped onto the insulation of the negative terminal wire.

  (6)?將控制屏及微機柜緊急停機按鈕釋放,按下微機柜上的起動按鈕。

  (6) Release the emergency stop button on the control screen and micro cabinet, and press the start button on the micro cabinet.

  (7)?用手動機油泵泵油, (或用電動預供油泵泵油,蓄電池電量允許時),當油壓力表指示為0.1Mpa時停停止供油。

  (7) Use a manual oil pump to pump oil (or use an electric pre supply oil pump to pump oil, when the battery power allows), and stop supplying oil when the oil pressure gauge indicates 0.1Mpa.

  (8)?盤車:用人力盤轉曲軸,至少兩周,不得有卡滯或異常現象。

  (8) Turning: Manually turn the crankshaft for at least two weeks without any jamming or abnormal phenomena.

  二、發電機組的啟動及運行

  2、 Startup and operation of generator set

  1、機組的啟動(1)?關閉機組氣源蝶閥,踏下啟動總開關,按下啟動按鈕(3~5秒),對機組排空。

  1. To start the unit (1), close the unit's air source butterfly valve, step on the main start switch, press the start button (3-5 seconds), and empty the unit.

  (2)?打開氣源蝶閥,燃氣壓力最低不小于0.05 MPa,最高不大于0.3MPa。

  (2) Open the gas source butterfly valve, and ensure that the minimum gas pressure is not less than 0.05 MPa and the maximum is not greater than 0.3 MPa.

  (3)?踩下腳踏開關,按下啟動按鈕,發動機啟動點火運轉。起動電機連續運行不得超過10秒,若三次啟動不成功,應及時查明原因后方可再次啟動。注意:發動機啟動后,要立即釋放啟動按鈕,并踢開腳踏開關,以免損壞啟動電機。

  (3) Step on the foot switch, press the start button, and the engine will start and ignite. The starting motor should not run continuously for more than 10 seconds. If it fails to start three times, the cause should be promptly identified before restarting. Attention: After starting the engine, immediately release the start button and kick off the foot switch to avoid damaging the starter motor.

  (4)?發動機啟動后,使其運轉在600r/min~800r/min總速運行,進行暖機,同時觀察各儀表指示是否正常。

  (4) After starting the engine, run it at a total speed of 600r/min~800r/min, warm up the engine, and observe whether the instrument readings are normal.

  (5)?觀察各缸缸溫、排溫是否正常。焦爐煤氣機組:當個別缸溫超過300C時,迅速減小相應缸步進電機控制器的步數,當缸溫低于150C;排溫低于300C時增加相應缸步進電機控制器的步數。

  (5) Observe whether the cylinder temperature and exhaust temperature of each cylinder are normal. Coke oven gas unit: When the temperature of individual cylinders exceeds 300C, quickly reduce the number of steps of the corresponding cylinder stepper motor controller. When the cylinder temperature is below 150C, increase the number of steps of the corresponding cylinder stepper motor controller.

  (6)?將怠速/額定轉換開關置于“額定”位置,使發電機組空載運行,待發動機油溫、水溫升至40C后,方可并網運行。

  (6) Place the idle/rated switch in the "rated" position to allow the generator set to run without load. Only when the engine oil and water temperatures rise to 40C, can it be connected to the grid for operation.

  (7)?調整電壓整定電位器使空載電壓為400V左右,調整轉速微調電位器使頻率為50HZ。

  (7) Adjust the voltage setting potentiometer to achieve a no-load voltage of around 400V, and adjust the speed fine-tuning potentiometer to achieve a frequency of 50HZ.

  (8)?按下控制屏上的儲能按鈕,給主開關儲能。

  (8) Press the energy storage button on the control screen to store energy for the main switch.

  2、機組并網運行

  2. Unit grid connected operation

  (1)、待發電機組運行正常后,先將發電機組的電壓、頻率調整至與電網大致相同時,再把同步測量開關置于“井車”位置,觀察同步表;

  (1) After the generator set is running normally, first adjust the voltage and frequency of the generator set to be roughly the same as the power grid, then place the synchronous measurement switch in the "well car" position and observe the synchronous meter;

  (2)、調整控制屏上的轉速微調電位器,使之與電網頻率相同,即同步表頻率差指示“Hz”指針處在中間略高位置:

  (2) Adjust the speed adjustment potentiometer on the control screen to be the same as the grid frequency, that is, the synchronous meter frequency difference indicator "Hz" pointer is slightly higher in the middle:

  (3) 、調節電壓整定電位器,使機組電壓與電網電壓相同,即同步表電壓差指示“V”指在中間位置。注意:反復調整發電機組,并觀察同步表相位差指示“S”指針,使其緩慢順時針旋轉。當指針旋轉接近垂直向上位置時,左手按下主開關合閘按鈕,右手斷開同步測量開關,主開關合閘并網發電。左手調整電壓整定電位器,將功率因數控制在滯后0.9-0.8之間,右手緩慢調整轉速微調電位器給機組加載。調整功率到合適位置(新機為60%Pe)最后將功率因數調整在0.8-0.9之間。

  (3) Adjust the voltage setting potentiometer to ensure that the unit voltage is the same as the grid voltage, i.e. the synchronous meter voltage difference indicator "V" is in the middle position. Attention: Adjust the generator set repeatedly and observe the phase difference indicator "S" pointer on the synchronous meter to make it slowly rotate clockwise. When the pointer rotates close to the vertical upward position, press the main switch closing button with your left hand, disconnect the synchronous measurement switch with your right hand, and close the main switch for grid connected power generation. Adjust the voltage setting potentiometer with your left hand to control the power factor between 0.9-0.8 hysteresis, and slowly adjust the speed adjustment potentiometer with your right hand to load the unit. Adjust the power to the appropriate position (60% Se for the new machine) and finally adjust the power factor between 0.8-0.9.

  (4)發電機并網運行中,應注意觀察電器儀表及微機柜主控畫面各項參數的指示狀況,并根據技術要求,及時修正各項參數。

  (4) During the grid connected operation of the generator, attention should be paid to observing the indication status of various parameters on the electrical instruments and micro cabinet main control screen, and timely correcting various parameters according to technical requirements.

  (5)機組正常運行中,每15分鐘作一次巡回檢查,觀察油溫、水溫、機油壓力、壓差、燃氣壓力及水位、油位,每兩小時對機組參數作一次記錄。三、發電機組的停機1、機組停機前,要先卸去負荷,緩慢逆時針調節轉速微調電位器,逐漸卸下負載。同時,緩慢旋轉電壓整定電位器,將功率因數控制在0.95-0.7之間,當功率降至50KW以下時,迅速按下分閘按鈕,然后使機組在額定轉速下運行幾分鐘。

  (5) During normal operation of the unit, a patrol inspection is conducted every 15 minutes to observe the oil temperature, water temperature, oil pressure, pressure difference, gas pressure, water level, and oil level. The unit parameters are recorded every two hours. 3、 Shutdown of Generator Set 1. Before shutting down the generator set, the load should be removed first, and the speed adjustment potentiometer should be slowly adjusted counterclockwise to gradually remove the load. At the same time, slowly rotate the voltage setting potentiometer to control the power factor between 0.95-0.7. When the power drops below 50KW, quickly press the disconnect button and let the unit run at rated speed for a few minutes.

  2、將轉速轉換開關撥至“怠速”位置,使機組轉速降至總速運行。

  2. Turn the speed conversion switch to the "idle" position to reduce the unit speed to the total speed for operation.

  3、待機組油溫、水溫降至40C以下時,關斷機組氣源蝶閥,將電磁閥開關、電調開關置于斷開位置,并按下微機柜緊急停機按鈕,機組停止。

  3. When the oil and water temperature of the standby unit drops below 40C, turn off the air source butterfly valve of the unit, place the solenoid valve switch and electric control switch in the off position, and press the emergency stop button of the micro cabinet to stop the unit.

  4、較長時間停機或機組檢修時,應關閉外循環冷卻水進口閥門和燃氣進口閥門。若環境溫度低于5C時,還應將機組內循環冷卻水放凈,并將水泵及外循環冷卻水管線上的放水堵打開將水放凈,必要時應用空氣壓縮機吹掃管線。

  4. When the unit is shut down for a long time or undergoing maintenance, the external circulation cooling water inlet valve and gas inlet valve should be closed. If the ambient temperature is below 5C, the circulating cooling water inside the unit should be drained completely, and the drain plugs on the water pump and external circulating cooling water pipeline should be opened to drain the water. If necessary, an air compressor should be used to blow the pipeline.

  5、手動盤車至少5圈,同時有手動預供油泵泵油0.01Mpa。

  5. Manual turning should be done at least 5 times, and there should be a manual pre supply oil pump that pumps oil at 0.01Mpa.

  四、發電機組故障停機的處理

  4、 Handling of generator set shutdown due to malfunction

  1、當發電機組因超速、過電流、逆功率、水溫、油溫高及油壓低故障,引起突然停機時。應關斷氣源,查明故障原因并妥善處理后方可開機。2、當遇有緊急情況,可按下“緊急停車”按鈕,使機組停機。注意:突然緊急停機后,一定要用人力盤車,盤轉曲軸至少5圈,同時用手動預供油泵泵油,待機組水溫、油溫降低后,進行檢查處理,并向有關部門或領導匯報。

  1. When the generator set suddenly shuts down due to overspeed, overcurrent, reverse power, high water temperature, high oil temperature, and low oil pressure faults. The gas source should be turned off, the cause of the malfunction should be identified and properly handled before starting up. 2. In case of emergency, the "emergency stop" button can be pressed to shut down the unit. Attention: After a sudden emergency stop, it is necessary to manually turn the crankshaft at least 5 times and use a manual pre supply oil pump to pump oil. After the water temperature and oil temperature of the standby group decrease, check and handle it, and report to the relevant department or leader.

  檢查燃氣發電機組的進氣系統,可按以下步驟進行:

  To check the intake system of the gas generator set, the following steps can be taken:

  1.外觀檢查

  1. Appearance inspection

  · 檢查進氣管道、濾清器、連接法蘭等部件是否有破損、裂縫或松動,確保所有連接部位密封良好,無漏氣現象。

  ·Check for any damage, cracks, or looseness in the intake pipes, filters, connecting flanges, and other components to ensure that all connecting parts are well sealed and free of air leaks.

  · 查看空氣濾清器是否堵塞或臟污,若濾清器阻力增大,可能導致進氣不暢,需及時清理或更換。

  ·Check if the air filter is clogged or dirty. If the filter resistance increases, it may cause poor air intake and needs to be cleaned or replaced in a timely manner.

  2.壓力檢查

  2. Pressure check

  · 檢查進氣系統的壓力傳感器,確保其正常工作,顯示的壓力值應在機組規定的范圍內。

  ·Check the pressure sensor of the intake system to ensure its normal operation, and the displayed pressure value should be within the range specified by the unit.

  · 若配備壓差傳感器,監測濾清器前后壓差,當壓差超過設定值時,可能表示濾清器堵塞或系統存在故障,需進一步排查。

  ·If equipped with a differential pressure sensor to monitor the pressure difference before and after the filter, when the pressure difference exceeds the set value, it may indicate that the filter is clogged or there is a system malfunction, and further investigation is needed.

  3.進氣閥門檢查

  3. Inspection of intake valve

  · 檢查進氣閥門的開閉狀態是否正常,閥門應能靈活開啟和關閉,無卡滯或泄漏。

  ·Check if the opening and closing status of the intake valve is normal. The valve should be able to open and close flexibly without any jamming or leakage.

  · 確認閥門的控制機構(如電動閥、氣動閥)工作正常,能準確響應機組的運行指令。

  ·Confirm that the control mechanism of the valve (such as electric valve, pneumatic valve) is working properly and can accurately respond to the operating instructions of the unit.

  4.進氣控制系統檢查

  4. Inspection of intake control system

  · 檢查進氣控制系統的電氣連接是否牢固,有無松動、腐蝕或損壞的跡象。

  ·Check if the electrical connections of the intake control system are secure and if there are any signs of looseness, corrosion, or damage.

  · 若機組配備進氣調節裝置(如節氣門、進氣旁通閥等),檢查其動作是否靈活,調節功能是否正常。

  ·If the unit is equipped with an intake control device (such as throttle valve, intake bypass valve, etc.), check whether its action is flexible and whether the adjustment function is normal.

  5.防喘振系統檢查

  5. Inspection of anti surge system

  · 對于配備防喘振裝置的機組,檢查防喘振閥的開閉狀態和動作是否正常,確保其能在機組運行過程中有效防止喘振現象的發生。

  ·For units equipped with anti surge devices, check whether the opening and closing status and action of the anti surge valve are normal, to ensure that it can effectively prevent the occurrence of surge phenomenon during the operation of the unit.

  · 檢查防喘振系統的控制邏輯和傳感器信號是否正常,確保系統能根據機組的運行工況自動調整防喘振閥的開度。

  ·Check whether the control logic and sensor signals of the anti surge system are normal, and ensure that the system can automatically adjust the opening of the anti surge valve according to the operating conditions of the unit.

  6.清潔與維護

  6. Cleaning and maintenance

  · 定期清理進氣系統的灰塵、雜物和積碳,保持進氣通道的暢通。

  ·Regularly clean the dust, debris, and carbon deposits in the intake system to keep the intake passage unobstructed.

  · 根據機組的運行環境和使用頻率,定期更換空氣濾清器,以保證進氣質量。通過以上檢查,可及時發現進氣系統的問題并進行處理,確保燃氣發電機組的正常運行。若發現問題,應及時聯系專業維修人員進行檢修。

  ·Regularly replace the air filter according to the operating environment and frequency of use of the unit to ensure intake quality. Through the above inspections, problems with the intake system can be promptly identified and addressed to ensure the normal operation of the gas generator set. If any problems are found, professional maintenance personnel should be contacted in a timely manner for repair.

  本文由 燃氣發電機組  友情奉獻.更多有關的知識請點擊  http://m.hdlelisa.com/   真誠的態度.為您提供為全面的服務.更多有關的知識我們將會陸續向大家奉獻.敬請期待.

  This article is a friendly contribution from a gas generator set For more related knowledge, please click http://m.hdlelisa.com/ Sincere attitude To provide you with comprehensive services We will gradually contribute more relevant knowledge to everyone Coming soon.

下一篇:
久久草av在线_gogo大胆日本视频一区_蜜臀久久久久久久_日韩高清国产一区在线_国产91高潮流白浆在线麻豆_极品少妇xxxx偷拍精品少妇_蜜臀av性久久久久蜜臀aⅴ_日韩av一区二区三区四区_99精品一区二区三区_奇米色777欧美一区二区
国产成人亚洲综合色影视| 日本中文字幕不卡| av中文字幕不卡| 美女国产一区二区三区| 国产成人精品免费| 美女视频免费一区| 丰满岳乱妇一区二区三区| 日韩高清中文字幕一区| 国产成人免费视频网站高清观看视频 | 国产精品99久久久久久宅男| 99国产精品久久久久久久久久 | 视频在线在亚洲| 国产伦理精品不卡| 蜜桃视频在线一区| jvid福利写真一区二区三区| 国产一区二区中文字幕| 日韩和欧美一区二区三区| 国产成人丝袜美腿| 韩国毛片一区二区三区| 日韩制服丝袜av| 成人av综合一区| 国产福利精品导航| 狠狠色丁香婷婷综合| 日本强好片久久久久久aaa| 成人v精品蜜桃久久一区| 国产一区二区三区香蕉| 六月婷婷色综合| 日韩av中文字幕一区二区| 成人精品视频.| 国产不卡一区视频| 国产乱对白刺激视频不卡| 久久精品免费观看| 久久99国产精品久久99果冻传媒| 日韩精品一级二级| 91色porny蝌蚪| 91丝袜呻吟高潮美腿白嫩在线观看| 国产+成+人+亚洲欧洲自线| 国内成人免费视频| 国产美女主播视频一区| 韩国三级电影一区二区| 国内欧美视频一区二区| 国产在线视视频有精品| 经典一区二区三区| 国产美女精品一区二区三区| 国产乱码精品一品二品| 国产另类ts人妖一区二区| 国内精品视频一区二区三区八戒| 久久99国产精品免费网站| 久久精品国产秦先生| 老司机一区二区| 久久69国产一区二区蜜臀| 免费视频最近日韩| 紧缚捆绑精品一区二区| 国产黄色精品视频| 国产91精品免费| 99麻豆久久久国产精品免费| 91在线观看污| 麻豆成人在线观看| 国产精品一二三区| 99久久精品久久久久久清纯| 视频一区免费在线观看| 精品在线一区二区| 国产激情视频一区二区三区欧美| 成人福利视频网站| 日本aⅴ免费视频一区二区三区| 久久精品国产一区二区三| 国内不卡的二区三区中文字幕 | 国产福利电影一区二区三区| 波波电影院一区二区三区| 日日骚欧美日韩| 激情五月婷婷综合| 成人免费高清在线| 免费观看在线综合色| 国产精品一二三区| 日韩高清在线不卡| 国产成人超碰人人澡人人澡| 天使萌一区二区三区免费观看| 另类综合日韩欧美亚洲| 成人免费看黄yyy456| 青青草成人在线观看| 国产不卡在线视频| 蜜臀av一级做a爰片久久| 国产成人精品免费看| 日本亚洲欧美天堂免费| 国产精品亚洲第一区在线暖暖韩国| caoporn国产精品| 国产在线国偷精品免费看| 99re8在线精品视频免费播放| 精品亚洲国产成人av制服丝袜| eeuss影院一区二区三区| 久久99国产精品成人| www.日韩精品| 国产成都精品91一区二区三| 成人免费毛片高清视频| 免费成人av在线| 99久久免费精品| 国产精品一级片在线观看| 七七婷婷婷婷精品国产| 97se亚洲国产综合自在线不卡| 国产在线麻豆精品观看| 日本va欧美va精品| 91免费视频大全| 成人精品免费网站| 国产成人综合视频| 国产一区二区精品久久| 久久国产乱子精品免费女| 视频一区在线视频| av激情综合网| 成a人片国产精品| 国产91丝袜在线观看| 国产一区二区三区四区五区入口| 日韩av不卡一区二区| a在线欧美一区| 成人av在线影院| 成人免费视频免费观看| 懂色av一区二区夜夜嗨| 国产很黄免费观看久久| 国产一区二区三区免费观看| 麻豆精品在线看| 蜜臂av日日欢夜夜爽一区| 日本一区中文字幕| 青青草精品视频| 日本在线观看不卡视频| 奇米在线7777在线精品| 秋霞电影网一区二区| 日韩和欧美的一区| 免费成人美女在线观看| 麻豆精品一二三| 久久超碰97人人做人人爱| 久久国产人妖系列| 黑人巨大精品欧美一区| 国产一区二区女| 国产99久久久国产精品潘金网站| 国产成人精品亚洲777人妖| 粉嫩久久99精品久久久久久夜| 成人一道本在线| 97久久久精品综合88久久| 丝袜亚洲另类欧美| 久久精品国产久精国产爱| 国产专区欧美精品| 粉嫩av一区二区三区粉嫩| a级精品国产片在线观看| 日韩精品亚洲一区二区三区免费| 欧美a级一区二区| 国产在线精品一区二区三区不卡| 国产剧情一区二区| 成人av在线影院| 男男视频亚洲欧美| 韩国欧美一区二区| 99久久777色| 久久成人18免费观看| 国产成人精品三级麻豆| 99riav一区二区三区| 免费看精品久久片| 国产东北露脸精品视频| av在线播放成人| 麻豆精品一区二区综合av| 国产精品一区免费在线观看| 丁香婷婷综合色啪| 日韩福利电影在线观看| 国产中文字幕精品| 91麻豆福利精品推荐| 国产真实精品久久二三区| 99精品在线观看视频| 另类专区欧美蜜桃臀第一页| 成人丝袜18视频在线观看| 奇米精品一区二区三区四区| 国产成人精品1024| 蜜桃视频第一区免费观看| 高清久久久久久| 另类的小说在线视频另类成人小视频在线 | 国产精品一区二区三区四区| 99re热视频精品| 国产一区二区精品久久91| 91蝌蚪porny九色| 国产成人一区在线| 蜜桃精品视频在线| 91免费视频网址| 国产91精品一区二区| 捆绑调教一区二区三区| 99国产精品久久久久久久久久| 国产精品一区一区| 美女脱光内衣内裤视频久久影院| 成人免费视频app| 国产综合色在线| 蜜桃av一区二区三区电影| zzijzzij亚洲日本少妇熟睡| 国产精品一级二级三级| 精品亚洲国内自在自线福利| 日本网站在线观看一区二区三区| 成人av网站在线| 国产.精品.日韩.另类.中文.在线.播放| 美女视频黄免费的久久 | 国产在线视视频有精品| 秋霞成人午夜伦在线观看| av福利精品导航| 国产精品一区二区久久不卡 | 成a人片国产精品| 国产在线精品一区二区三区不卡| 麻豆精品一区二区三区| 日韩精品一级中文字幕精品视频免费观看| 国产99久久久精品| 国产成人欧美日韩在线电影| 韩国v欧美v亚洲v日本v| 国产一区二区三区在线观看精品| 看电视剧不卡顿的网站| 另类的小说在线视频另类成人小视频在线 | 国产精品99久久久久久久女警| 裸体一区二区三区| 老司机免费视频一区二区三区| 日本不卡的三区四区五区| 日日夜夜一区二区| 日本午夜一区二区| 久久激情综合网| 精品中文字幕一区二区小辣椒| 精品无人码麻豆乱码1区2区| 久久99最新地址| 国产精品伊人色| 成人在线视频一区| 91丨九色丨蝌蚪丨老版| 日日夜夜免费精品| 久久国产精品露脸对白| 国产一区二区影院| 福利一区二区在线观看| 暴力调教一区二区三区| 日韩av一区二| 狠狠色丁香久久婷婷综合_中| 国产精品亚洲а∨天堂免在线| 国产成人在线视频播放| 99热99精品| 蜜桃av噜噜一区| 国产传媒欧美日韩成人| 99久久久精品| 免费精品视频在线| 国产福利精品一区二区| 91在线云播放| 久久精品久久综合| 成人小视频免费在线观看| 91视频精品在这里| 国产一区欧美日韩| 99re成人在线| 韩国av一区二区三区在线观看| 懂色av中文字幕一区二区三区| 日韩综合在线视频| 国产一区二区导航在线播放| 成a人片亚洲日本久久| 免费人成黄页网站在线一区二区| 国产精品自产自拍| 日本怡春院一区二区| 国产精品77777| 日韩和的一区二区| 国产99久久精品| 麻豆免费精品视频| bt欧美亚洲午夜电影天堂| 久久国产精品一区二区| www.成人在线| 国产精品1024| 麻豆高清免费国产一区| 99视频一区二区| 国产精品影视在线观看| 免费不卡在线观看| av男人天堂一区| 国产suv精品一区二区883| 日本va欧美va精品| 99久久婷婷国产综合精品| 国产一区二区三区香蕉| 美女网站色91| 日韩精品亚洲一区| 成人综合激情网| 韩日精品视频一区| 美女精品一区二区| 日韩精品免费视频人成| 成人avav影音| 成人免费毛片片v| 国产精品影视在线观看| 韩日精品视频一区| 久99久精品视频免费观看| 日韩一区欧美二区| 91日韩在线专区| 99国产精品久久久久| www.成人网.com| 成人av电影在线| www.一区二区| 成人福利视频在线| 不卡一区二区三区四区| 懂色av一区二区在线播放| 国产精品白丝jk白祙喷水网站| 国产一区二区视频在线| 国产一区二区在线免费观看| 韩国av一区二区| 国产一区二区在线观看视频| 国产一区二区精品久久91| 国内一区二区在线| 国内精品伊人久久久久av一坑| 国内精品视频666| 国产真实乱偷精品视频免| 国产一区二区成人久久免费影院| 黄页网站大全一区二区| 国产一区二区三区在线观看免费 | 国产一二精品视频| 狠狠色狠狠色合久久伊人| 精品一区二区三区在线观看| 国产综合一区二区| 国产高清精品在线| 成人不卡免费av| 三级久久三级久久| 久久99精品一区二区三区三区| 国产伦精一区二区三区| 成人午夜又粗又硬又大| 91在线视频官网| 蜜臀国产一区二区三区在线播放| 激情五月婷婷综合| 国产成人啪免费观看软件| 北岛玲一区二区三区四区| 日韩中文字幕一区二区三区| 久久国产精品一区二区| 国产精品99精品久久免费| 99久久久久久| 看国产成人h片视频| 国产激情视频一区二区在线观看| www.在线成人| 另类的小说在线视频另类成人小视频在线| 国内精品第一页| av在线这里只有精品| 青青草国产精品97视觉盛宴| 国产精品中文字幕日韩精品| 99视频一区二区三区| 久久99精品国产麻豆婷婷| 成人视屏免费看| 美女任你摸久久 | 成人美女视频在线观看| 日韩国产在线观看| 精品亚洲porn| 波多野结衣精品在线| 裸体一区二区三区| 成人a区在线观看| 精品写真视频在线观看| www.日韩在线| 国产一区二区三区日韩| 视频一区免费在线观看| 国产91综合一区在线观看| 日韩avvvv在线播放| 成人午夜在线免费| 精品一区二区国语对白| 99re在线精品| 国产69精品久久久久777| 麻豆精品在线看| 91免费看`日韩一区二区| 国产乱码精品一区二区三区av | 国产精品一区二区在线播放| 91视频在线看| 成人看片黄a免费看在线| 精品一区二区三区视频| 日本欧美一区二区在线观看| 成人午夜又粗又硬又大| 国产一区二区不卡在线| 久久精品国产精品亚洲精品| 91色.com| 99精品偷自拍| 成人精品高清在线| 国内精品写真在线观看| 麻豆精品一二三| 免费在线欧美视频| 欧美a级一区二区| 日韩高清不卡一区| 91丝袜美腿高跟国产极品老师| 成人精品国产一区二区4080 | 国产成人免费视频网站高清观看视频| 日本成人在线一区| 视频一区在线视频| 爽好多水快深点欧美视频| 99视频在线精品| 99精品在线免费| 99国产精品久久久久久久久久 | 蜜臀91精品一区二区三区| 99国产精品久| 99久久国产综合精品色伊| 成人国产亚洲欧美成人综合网| 国产成人av自拍| 国产a视频精品免费观看| 国产成人免费视频精品含羞草妖精| 国产乱码精品一区二区三区五月婷| 久久99精品久久久久| 久久精品国产亚洲一区二区三区| 蜜臀精品一区二区三区在线观看| 日韩高清不卡一区二区三区| 日韩国产精品久久久| 蜜桃传媒麻豆第一区在线观看| 男人的天堂久久精品| 久久精品久久综合| 国产美女精品一区二区三区| 国产成人亚洲综合a∨婷婷| 国产99久久久国产精品| 波多野结衣在线一区| 91色九色蝌蚪| 久久99精品久久久久婷婷| 国产一区二区免费视频| 成人综合激情网| 91色.com| 韩国成人福利片在线播放|